131 - 140 of 234 results
Applications
Fields of application Future-proof in all fields of application with individual solutions aquatherm has the solution for your challenge - Benefit from the versatile application possibilities of our…
Wall system: with timber stud frame and panelling with building boards
Wall system: Timber stud frame and panelling with building boards Walls with a wooden substructure and panelling with building boards offer individual design options with cost-effective execution. In…
Health Resort Luisenhöhe , Horben, Germany
Facts Project Luisenhöhe Health Resort Completion 2023 Location Horben, Germany The challenge One challenge in planning the Luisenhöhe heating/cooling ceiling was the architecture of the new building…
Cologne/Bonn Airport, Germany
Facts PROJECT Connecting corridor between two terminals at Cologne/Bonn Airport COMPLETION 2019 LOCATION Cologne, Germany THE CHALLENGE Due to large glass surfaces and many people, the new connecting…
EPDs and certificates
Environmental Product Declarations (EPD) Environmental product declarations are important - for the construction industry and therefore, for us and our customers. To download our EPDs, please fill in…
Kö-Bogen I und II, Germany
Facts Project Kö-Bogen I and II Completion 2021 Location Düsseldorf, Germany The challenge For Kö-Bogen I and the food court of Kö-Bogen II, a sprinkler piping system was sought that was not only safe…
Multivac, Germany
Facts Project Multivac Completion 2021 Location Wolfertschwenden, Germany The challenge As the new MULTIVAC building faces south with a continuous glass facade, an unusual solution was needed to cover…
Gippsland Recreation und Aquatic Centre, Australia
Facts Project Gippsland Recreation und Aquatic Centre (GRAC) Completion 2021 Location Traralgon, Australia The challenge For the new aquatic centre, a piping system was sought that was not only…
DJO, Germany
Facts Project DJO Completion 2020 Location Freiburg, Germany The challenge A radiator and air-conditioning cassette installation was originally planned for the heating & cooling of the five-story DJO…